• Client: ODH

  • Project Date: Not Completed 2014

  • Location: Ras El Khema, UAE

  • Scope: Interior Design

INTERIOR DESIGN OPTIMIZATION TO THE EXISTING STAFF HOUSING PROJECT TO BE CONVERTED INTO THE LARGEST NUMBER OF KEYS POSSIBLE . THE CHALLENGE IN THIS PROJECT WAS THE CONNECTION BETWEEN THE EXISTING BUILDINGS THAT WERE TO BE RE-ADAPTED INTO A HOTEL THUS NEEDING A MAIN BUILDING TO HOUSE THE RECEPTION. THE DESIGN PROPOSED A SMALL FORM WITH A CHROME LINED DOME, CONNECTED TO THE EXISTING BUILDINGS ON BOTH SIDES.

005-rack

006-rack

007-rack